---
product_id: 17340956
title: "Handset Cord 9 Ft Dark Grey With Long Lead Heavy Duty New in a Factory Sealed Bag"
brand: "great lakes communications"
price: "€ 16.78"
currency: EUR
in_stock: true
category: "Electronics"
url: https://www.desertcart.sk/products/17340956-handset-cord-9-ft-dark-grey-with-long-lead-heavy
store_origin: SK
region: Slovakia
---

# Handset Cord 9 Ft Dark Grey With Long Lead Heavy Duty New in a Factory Sealed Bag

**Brand:** great lakes communications
**Price:** € 16.78
**Availability:** ✅ In Stock

## Quick Answers

- **What is this?** Handset Cord 9 Ft Dark Grey With Long Lead Heavy Duty New in a Factory Sealed Bag by great lakes communications
- **How much does it cost?** € 16.78 with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.sk](https://www.desertcart.sk/products/17340956-handset-cord-9-ft-dark-grey-with-long-lead-heavy)

## Best For

- great lakes communications enthusiasts

## Why This Product

- Trusted great lakes communications brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Description

Need to replace an old twisted telephone handset cord? This is one of the heavy duty 9 Foot handset cords. It has the hard to find long tail. The length of our cords is measured from end to end, before curling. After curling, they measure about 16 inches (Not Stretched). They are UL listed, and individually packaged in a factory sealed bag.

## Features

- Hard to find Long Tail
- ISO 9002 certified
- Heavy Duty
- Dark Grey Color
- UL Listed

## Images

![Handset Cord 9 Ft Dark Grey With Long Lead Heavy Duty New in a Factory Sealed Bag - Image 1](http://ecx.images-amazon.com/images/I/41m50TDJNOL.jpg)
![Handset Cord 9 Ft Dark Grey With Long Lead Heavy Duty New in a Factory Sealed Bag - Image 2](http://ecx.images-amazon.com/images/I/21ZkC0ncCWL.jpg)
![Handset Cord 9 Ft Dark Grey With Long Lead Heavy Duty New in a Factory Sealed Bag - Image 3](http://ecx.images-amazon.com/images/I/51WfqHiqdPL.jpg)
![Handset Cord 9 Ft Dark Grey With Long Lead Heavy Duty New in a Factory Sealed Bag - Image 4](http://ecx.images-amazon.com/images/I/51RE9HGTidL.jpg)

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.sk/products/17340956-handset-cord-9-ft-dark-grey-with-long-lead-heavy](https://www.desertcart.sk/products/17340956-handset-cord-9-ft-dark-grey-with-long-lead-heavy)

---

*Product available on Desertcart Slovakia*
*Store origin: SK*
*Last updated: 2026-06-17*